Instrumentation · Engineering · Package · PLC
0755-82221901 sales@ainstru.com

M12 4-pin female angled cable

M12 4-pin female angled cable
4-pin female angled cable
M12 waterproof 90-degree aviation threaded connector with cable — PVC molded elbow connector, for electronics/aerospace, lengths from 0.5 m to 50 m to meet different environmental requirements; straight 3-pin female with 2 m cable, elbow 4-pin female with 5 m cable, elbow 4-pin female with 2 m cable, straight 8-pin female with 2 m cable

Product Overview

YG-12-L-4B-2M-PVC

Model YG-12-L-4B-2M-PVC
Cross-sectional area 6-8mm
Thread specification M12*1
Name M12 4-pin female elbow connector cable
Number of pins 4-pin (2, 4, 5, 8-pin optional)
Wiring 1 brown, 2 white, 3 blue, 4 black
Wire diameter 5MM
Potting material Eco-friendly PVC (PA/PU optional)
Conductor 0.25MM2 pure copper wire core, 10.34MM2 pure copper wire core
Cable sheath Eco-friendly PVC (PUR/Teflon optional)
Contact pin Copper, gold-plated
Insulation material Eco-friendly PVC
Screw Copper, nickel-plated
Operating range 0C° to +80C° (-40C° to +200C° optional)
Ambient temperature +85°C to -25°C
Length 2 m (0.1 m to 50 m optional)
Packaging PE packaging bag

Configurator / Comparison

ConfigureEnter a product model to configure
CompareEnter the product models to compare — up to three products
Municipal Wastewater Treatment

Municipal Wastewater Treatment · system component — Stock Configuration Case

Application Context

the inlet, biological and outlet stages of a municipal plant is a typical Municipal Wastewater Treatment duty. The project started from system component, focusing on supplying power, isolation, brackets and accessories for measuring loops.

Process Constraints

effluent parameters drift and probes foul with sludge and biofilm, and high solids and corrosive fractions, with large diurnal flow swings only amplify it. The system component specification must therefore cover configured as a set by loop count, supply scheme and mounting space.

Delivery Approach

Delivery was handled as the stock channel — configuring from stock and delivered quickly. Execution centred on configured as a set by loop count, supply scheme and mounting space, together with stable compliance with Grade 1A discharge limits and online data reporting.

Field Results

Operation shows the benefit clearly — arriving as a kit, cutting field wiring and commissioning time, with confidence in this measuring point improving markedly.

Food & Beverage

Food & Beverage · system component — Stock Configuration Case

Customer Profile

The typical setting in Food & Beverage is dosing, pasteurising, filling and CIP stages. The measuring point is system component; the focus is supplying power, isolation, brackets and accessories for measuring loops.

Key Difficulties

Conditions are syrups, dairy and beverages that scale easily, under strict hygienic requirements and, on top of that, frequent cleaning demands instruments that withstand hot CIP/SIP caustic cycles, which a standard configuration cannot handle for long. The design therefore starts with configured as a set by loop count, supply scheme and mounting space.

Implementation

The scope ran through the stock channel: configuring from stock and delivered quickly. Technically it hinges on configured as a set by loop count, supply scheme and mounting space, and on these requirements: food-safety and hygienic design per 3-A / EHEDG.

Customer Benefit

In practice this means arriving as a kit, cutting field wiring and commissioning time, which cut the workload on the site maintenance team.

Chemical & Pharmaceutical

Chemical & Pharmaceutical · system component — Stock Configuration Case

Project Background

The project covers reactors, metering vessels and finished-product tanks. The work centres on system component and the core task is supplying power, isolation, brackets and accessories for measuring loops.

Operating Challenges

The medium and duty are characterised by highly corrosive media with solvents and crystallisation, partly in explosive atmospheres, and corrosion plus Ex protection shortens instrument life and makes downtime costly. So system component cannot be specified generically — it calls for configured as a set by loop count, supply scheme and mounting space.

Solution

The Ainstru engineering team worked through the stock channel: configuring from stock and delivered quickly. The configuration involves configured as a set by loop count, supply scheme and mounting space, with these requirements in view: Ex certification and GMP traceability of records.

Results

Since start-up the system has run steadily; the practical result is arriving as a kit, cutting field wiring and commissioning time.

Power & Energy

Power & Energy · system component — Stock Configuration Case

Project Overview

The site is boiler feedwater, turbine condensate and FGD/DeNOx systems. The customer wanted system component properly configured on the existing plant, with the aim of supplying power, isolation, brackets and accessories for measuring loops.

Technical Challenges

What actually causes trouble is high temperature and pressure with both steam and saline water, and drift under high temperature and pressure, with very costly unplanned outages. All of this means the system component configuration has to involve configured as a set by loop count, supply scheme and mounting space.

Configuration

Supply and installation were organised through the stock channel: configuring from stock and delivered quickly. On site this meant configured as a set by loop count, supply scheme and mounting space, checked line by line against: compliance with power-industry codes and unit availability targets.

Performance

After commissioning the outcome is arriving as a kit, cutting field wiring and commissioning time, and the readings are now used for process tuning.