Promag 400


1.Installation position

img1

installed in drain-down piping

in vertical down pipe(h5 m),need in the sensor

,Avoid damage during pumping.

the inner lining of the measuring tube. This measure can also protect the system from long-term accuracy degradation.

img2

installed in vertical down pipe

1relief valve

2siphon

hLength of straight down pipe


in non-full pipe

placed obliquelyNon-full pipepiping. ATC detection

(EPD)function is used to detect the empty pipe orNon-full pipeStatus,mention


for additional protection.

img3


img4

2.Installation direction

reference sensorthe arrow on the nameplate.be sure

arrow points in line with the flow direction of the medium in the pipe.

The best installation position should be ableprevent measuring the most tubegas and air accumulation

poly,as well as solid deposition.

img5


3.Front and rear straight pipe sections

please guaranteethe following front and rear straight pipe lengths to ensure measurement accuracy:

img6


4.System pressure

img7


Do not install the sensor on the inlet side of the pump to avoid damage during pumping

measuring tube inner village. In addition,use piston pump, male membraneor salamander pump

, a pulsating flow buffer needs to be installed.

5.vibration

is used in a strong vibration environment.Please support and fix the pipe and sensor

. Measures to avoid vibration of equipment(L> 10 m)


img8

6.adapter tube

the sensor needs to be installed in a large bore pipe,Selectable

DIN EN 545standard adapter pipe(double flangereducing tube)for safety

loaded.measuring polea slow-moving fluid,makes the flow rate increase, lift

high measurement accuracy.

Refer to the figure below to calculate the usereducing tubeand expanding pipe

small.

.Calculate diameter ratiod/D.

according to flow rate(reducing tubeDownstream)and diameter ratiod/Dunder reference

diagram,calculate the size of the pressure loss.

img9