Technical Data
CompareConductivity
| Measuring Principle | Conductive |
| Application | Monitoring ground water, surface water or wastewater. |
| Installation | Fixed installation |
| Characteristic | Installation into tanks, sewers, wells, basins, channels or rivers. |
| Design | Immersion assembly with flexible body (hose). |
| Material | Poly ethylene (PE) |
| Process pressure | Max. 4 bar (relative) |
| Connection | Flange DN50, Flange 2", Chain bracket, Thread |
ORP / Redox
| Measuring Principle | Sensor ORP / Redox |
| Application | Monitoring ground water, surface water or wastewater. |
| Installation | Fixed installation |
| Characteristic | Installation into tanks, sewers, wells, basins, channels or rivers. |
| Design | Immersion assembly with flexible body (hose). |
| Material | Poly ethylene (PE) |
| Process pressure | Max. 4 bar (relative) |
| Connection | Flange DN50, Flange 2", Chain bracket, Thread |
Oxygen
| Measuring Principle | Amperometric oxygen measurement |
| Application | Monitoring ground water, surface water or wastewater. |
| Installation | Fixed installation |
| Characteristic | Installation into tanks, sewers, wells, basins, channels or rivers. |
| Design | Immersion assembly with flexible body (hose). |
| Material | Poly ethylene (PE) |
| Process pressure | Max. 4 bar (relative) |
| Connection | Flange DN50, Flange 2", Chain bracket, Thread |
pH
| Measuring Principle | Potentiometric |
| Application | Monitoring ground water, surface water or wastewater. |
| Installation | Fixed installation |
| Characteristic | Installation into tanks, sewers, wells, basins, channels or rivers. |
| Design | Immersion assembly with flexible body (hose). |
| Material | Poly ethylene (PE) |
| Process pressure | Max. 4 bar (relative) |
| Connection | Flange DN50, Flange 2", Chain bracket, Thread |
CYA10 immersion mounting assembly for wastewater, surface water and industrial applications
Advantages
• Various installation options (fixing via flange connection or in combination with Flexdip CYH112) allow easy installation in shafts, rivers and boilers without tools
• The flexible hose of the holder makes sensor handling easy and saves maintenance time at the measuring point even at large immersion depths
• The compact design of the holder, used with PG13.5 sensors (diameter “12 mm”), facilitates measuring point installation and allows installation in pipes/
channels, boilers, sewer pipes or manholes
• Measuring points can be installed and operated in wastewater drains, covered basins and hazardous areas, offering outstanding application flexibility
Application
The CYA10 immersion assembly has a maximum insertion depth of 10 meters and is used in the following applications:
• Monitoring of surface water (groundwater wells and rivers) as well as brackish water and seawater
• Wastewater treatment
• Utilities
The Dipfit CYA10 is compatible with all Memosens digital sensors with a diameter of 12 mm (no liquid KCl electrolyte) and can measure the following parameters:
• pH/ORP
• Conductivity
• Dissolved oxygen
Spare Parts & Accessories 10
10 spare parts · click to collapse
| Order code | Description | |
|---|---|---|
| 71671538 | Kit CYA10 Sealing oval flange | Details |
| 71671555 | CYA10 Sealing Kit EPDM | Details |
| 71671557 | CYA10 Cable gland kit | Details |
| 71671577 | CYA10 multifunctional clamp ring kit | Details |
| 71671587 | Kit CYA10 Protection cap | Details |
| 71671585 | Kit CYA10 Hose EPDM, length 1 m | Details |
| 71717049 | Kit CYA10 EPDM hose, length 3 m | Details |
| 71717051 | Kit CYA10 Hose EPDM, length 5 m | Details |
| 71717052 | Kit CYA10 Hose EPDM, length 10 m | Details |
| 71717056 | Kit CYA10 Immersion weight 316L/1.4404 | Details |
Configurator / Comparison
Source:Endress+Hauserpublic information from the website
Manuals & Documents 6
All documents for this modelCase Studies
Municipal Wastewater Treatment · Process Measuring and Control Instrument — Application Case
Application Context
the inlet, biological and outlet stages of a municipal plant is a typical Municipal Wastewater Treatment duty. The project started from Process Measuring and Control Instrument, focusing on measurement, control and recording for process loops.
Process Constraints
effluent parameters drift and probes foul with sludge and biofilm, and high solids and corrosive fractions, with large diurnal flow swings only amplify it. The Process Measuring and Control Instrument specification must therefore cover configured by input type, loop count and communication.
Delivery Approach
Delivery was handled as the system components range — supplying as a full cabinet and signal-chain configuration. Execution centred on configured by input type, loop count and communication, together with stable compliance with Grade 1A discharge limits and online data reporting.
Field Results
Operation shows the benefit clearly — configured on site, cutting back-and-forth during system commissioning, with confidence in this measuring point improving markedly.
Municipal Wastewater Treatment · data manager — Application Case
Site Conditions
This is a Municipal Wastewater Treatment customer whose plant is at the inlet, biological and outlet stages of a municipal plant. The main task was centralised data acquisition, storage and forwarding to management platforms.
The Problem
The difficulty lies in high solids and corrosive fractions, with large diurnal flow swings; at the same time effluent parameters drift and probes foul with sludge and biofilm. Specification therefore means selected by channel count, storage depth and forwarding protocol.
What We Did
We took a system components range approach — supplying as a full cabinet and signal-chain configuration. Delivery was built around selected by channel count, storage depth and forwarding protocol, with point-by-point checks on: stable compliance with Grade 1A discharge limits and online data reporting.
Operating Outcome
In service the system performs as intended — automatic backfill after outages, greatly improving data completeness, with routine maintenance falling noticeably.
Municipal Wastewater Treatment · Power supplies and safety barriers — Application Case
Project Overview
The site is the inlet, biological and outlet stages of a municipal plant. The customer wanted Power supplies and safety barriers properly configured on the existing plant, with the aim of supplying power and intrinsic-safety isolation to field instruments.
Technical Challenges
What actually causes trouble is high solids and corrosive fractions, with large diurnal flow swings, and effluent parameters drift and probes foul with sludge and biofilm. All of this means the Power supplies and safety barriers configuration has to involve selected by loop count, Ex rating and redundancy needs.
Configuration
Supply and installation were organised through the system components range: supplying as a full cabinet and signal-chain configuration. On site this meant selected by loop count, Ex rating and redundancy needs, checked line by line against: stable compliance with Grade 1A discharge limits and online data reporting.
Performance
After commissioning the outcome is compliant IS loops, lowering live-work risk during maintenance, and the readings are now used for process tuning.
Municipal Wastewater Treatment · Gateways and modems — Application Case
Project Background
The project covers the inlet, biological and outlet stages of a municipal plant. The work centres on Gateways and modems and the core task is converting field data into remote transmission channels.
Operating Challenges
The medium and duty are characterised by high solids and corrosive fractions, with large diurnal flow swings, and effluent parameters drift and probes foul with sludge and biofilm. So Gateways and modems cannot be specified generically — it calls for configured by protocol, tag count and carrier network conditions.
Solution
The Ainstru engineering team worked through the system components range: supplying as a full cabinet and signal-chain configuration. The configuration involves configured by protocol, tag count and carrier network conditions, with these requirements in view: stable compliance with Grade 1A discharge limits and online data reporting.
Results
Since start-up the system has run steadily; the practical result is remote sites can report back, making unattended operation possible.