Instrumentation · Engineering · Package · PLC
0755-82221901 sales@ainstru.com

CPA111 Dipfit W

CPA111 Dipfit W
Dipfit W CPA111
Configurable Models 2 models
The Dipfit CPA111 immersion assembly is designed for applications in open and closed tanks. It offers space for three sensors that can be easily mounted and removed via the bayonet lock. The adjustable flange gives you the required flexibility for universal use. Dipfit is the time- and cost-efficient solution for standard water and wastewater treatment.
Compare

ORP / Redox

Measuring Principle Sensor ORP / Redox
Application Water, waste water, process
Installation Immersion assembly
Characteristic For open and closed tanks and channels
Design Bayonet technology, 3 electrode installation locations,
120 mm electrodes, variable assembly length, integrated spray cleaning CPR31, external spray cleaning CPR30, process connection with fix or adjustable flange
Material Sensor holder: PP-GF 20
Immersion tube: PP
O-ring: VITON
Dimension 500 to 3000 mm (19.7 to 118 inch), special lengths on request
Process temperature max. 80°C
( 176°F)
Process pressure max. 4 bar at 20°C
(58 psi at 68°F)
Connection - Suspended assembly - lap joint flange DN100- pressurized flange DN100/PN4 - adjustable flange DN100

pH

Measuring Principle Potentiometric
Application Water, waste water, process
Installation Immersion assembly
Characteristic For open and closed tanks and channels
Design Bayonet technology, 3 electrode installation locations,
120 mm electrodes, variable holder length, integrated spray cleaning CPR31, external spray cleaning CPR30, process connection with fix or adjustable flange
Material Sensor holder: PP-GF 20
Immersion tube: PP
Dimension Length: 500 to 3000 mm (19.7 to 118 inch), special lengths on request
Process temperature Max. 80 °C (176 °F)
Process pressure Max. 4 bar at 20°C
(Max. 58 psi at 68°F)
Connection Suspended assembly, lap joint flange DN100
Pressurized flange DN100/PN4, adjustable flange DN100

Product Overview

The Dipfit CPA111 immersion assembly is designed for installation in open and closed tanks. It provides three sensor mounting positions, and the snap-fit mechanical design makes the assembly easy to install and remove. The adjustable flange allows flexible adjustment of the immersion depth to meet various standard requirements. Dipfit is a time-saving, economical solution for the water and wastewater industry.

  • Benefits

  • Sensor holder with snap-fit for easy installation and removal

  • With adjustable flange for flexible adjustment of the immersion depth

  • Environmentally friendly polypropylene material

  • Up to three 120 mm sensors can be installed for pH/ORP or dissolved oxygen measurement

  • Application areas

  • The Dipfit CPA111 can be used in open channels, troughs and closed tanks:

  • Wastewater

  • Water treatment

  • For applications with pressures up to 4 bar

Spare Parts & Accessories 18

18 spare parts · click to collapse
Order codeDescription
71467082Kit CPA111 EPDM sealing setDetails
71467083Kit CPA111 Sealing set FKMDetails
51500400CXA111/140 CoverDetails
71467085Kit CxA111/140 Small partsDetails
71467090Kit CxA111 Star handle screws (2x)Details
71467087Kit CxA111 adapter for adj. flangeDetails
71467086Kit CxA111 adjustable flangeDetails
50066593pressure flangeDetails
71467077Kit CPA111 electr. holder small partsDetails
71467078electrode retaining sleeve for CPA111Details
71467080Kit CPA111 potential matching pinDetails
50075422Suspension bracket assemblyDetails
71467089Kit CxA111 Additional WeightsDetails
50066570Calibration VesselMaterial: PPDetails
50066569humidification vesselFor preventing drying out of electrode Material: PPDetails
50066561Mounting and Fixing KitFor easy mounting of CPA's on wall Material: SS316 / 1.4301Details
50091993EPDM O-ring setSuccessor Kit 71467082Details
50072145Viton O-ring set for CPA111O-ring set Viton for CPA 111Details

Configurator / Comparison

ConfigureEnter a product model to configure
CompareEnter the product models to compare — up to three products

Source: public information from the Endress+Hauser website

2 models · click to collapse
All documents for this model
6 documents · click to expand
BA

Dipfit CPA111 操作手册 Chinese

Rev. 1315 28 pages
Preview
BA

Dipfit CPA111 Operating Instructions English

Rev. 1315 28 pages
Preview
BA

Operating Instructions CPA111 English

26 pages
Preview
TI

技术资料 Dipfit W CPA111 Chinese

Rev. 1315 12 pages
Preview
TI

技术资料 Dipfit W CPA111 Chinese

Rev. 0607 16 pages
Preview
TI

Technical Information CPA 111 English

Rev. 1315 12 pages
Preview
Municipal Wastewater Treatment

Municipal Wastewater Treatment · brackets — Application Case

Customer Profile

The typical setting in Municipal Wastewater Treatment is the inlet, biological and outlet stages of a municipal plant. The measuring point is brackets; the focus is mounting, fixation and position adjustment for instruments.

Key Difficulties

Conditions are high solids and corrosive fractions, with large diurnal flow swings and, on top of that, effluent parameters drift and probes foul with sludge and biofilm, which a standard configuration cannot handle for long. The design therefore starts with checking structural strength by material, corrosion class and load.

Implementation

The scope ran through the system components range: supplying as a full cabinet and signal-chain configuration. Technically it hinges on checking structural strength by material, corrosion class and load, and on these requirements: stable compliance with Grade 1A discharge limits and online data reporting.

Customer Benefit

In practice this means accurate mounting positions that remove measurement bias at the source, which cut the workload on the site maintenance team.

Food & Beverage

Food & Beverage · brackets — Application Case

Project Background

The project covers dosing, pasteurising, filling and CIP stages. The work centres on brackets and the core task is mounting, fixation and position adjustment for instruments.

Operating Challenges

The medium and duty are characterised by syrups, dairy and beverages that scale easily, under strict hygienic requirements, and frequent cleaning demands instruments that withstand hot CIP/SIP caustic cycles. So brackets cannot be specified generically — it calls for checking structural strength by material, corrosion class and load.

Solution

The Ainstru engineering team worked through the system components range: supplying as a full cabinet and signal-chain configuration. The configuration involves checking structural strength by material, corrosion class and load, with these requirements in view: food-safety and hygienic design per 3-A / EHEDG.

Results

Since start-up the system has run steadily; the practical result is accurate mounting positions that remove measurement bias at the source.

Chemical & Pharmaceutical

Chemical & Pharmaceutical · brackets — Application Case

Project Overview

The site is reactors, metering vessels and finished-product tanks. The customer wanted brackets properly configured on the existing plant, with the aim of mounting, fixation and position adjustment for instruments.

Technical Challenges

What actually causes trouble is highly corrosive media with solvents and crystallisation, partly in explosive atmospheres, and corrosion plus Ex protection shortens instrument life and makes downtime costly. All of this means the brackets configuration has to involve checking structural strength by material, corrosion class and load.

Configuration

Supply and installation were organised through the system components range: supplying as a full cabinet and signal-chain configuration. On site this meant checking structural strength by material, corrosion class and load, checked line by line against: Ex certification and GMP traceability of records.

Performance

After commissioning the outcome is accurate mounting positions that remove measurement bias at the source, and the readings are now used for process tuning.

Power & Energy

Power & Energy · brackets — Application Case

Site Conditions

This is a Power & Energy customer whose plant is at boiler feedwater, turbine condensate and FGD/DeNOx systems. The main task was mounting, fixation and position adjustment for instruments.

The Problem

The difficulty lies in high temperature and pressure with both steam and saline water; at the same time drift under high temperature and pressure, with very costly unplanned outages. Specification therefore means checking structural strength by material, corrosion class and load.

What We Did

We took a system components range approach — supplying as a full cabinet and signal-chain configuration. Delivery was built around checking structural strength by material, corrosion class and load, with point-by-point checks on: compliance with power-industry codes and unit availability targets.

Operating Outcome

In service the system performs as intended — accurate mounting positions that remove measurement bias at the source, with routine maintenance falling noticeably.