Instrumentation · Engineering · Package · PLC
0755-82221901 sales@ainstru.com

CPA240 Flowfit P

CPA240 Flowfit P
Flowfit P CPA240
The Flowfit CPA240 flow assembly is designed for all demanding applications where high temperatures and pressures are involved. With its various connections, Flowfit flexibly adapts to your process offering space for three sensors. Simple installation and removal of the sensors save time for maintenance and recalibration.
Compare

ORP / Redox

Measuring Principle Sensor ORP / Redox
Application Drinking water treatment plants, boiler feedwater and ultra-pure water plants, cooling-water circuits, fertiliser production, sugar production, gas scrubbers, petrochemical plants
Installation Flow through holder
Characteristic Piping, bypass
Design 3 electrode installation locations, 120mm electrodes, flow direction horizontal or from the bottom, thread connection G1/2" for spray cleaning
Material Flow vessel: PVDF or stainless steel 1.4404
O-rings: EPDM, Viton, Chemraz or Fluoraz
Process temperature PVDF version: 0 to 120 °C (32 to 248 °F)
Stainless steel version: -15 to 150 °C (5 to 302 °F)
With EPDM: -15 to 140 °C (5 to 284 °F)
Process pressure PVDF version: max. 8 bar at 50 °C (max. 116 psi at 122 °F)
Stainless steel version: max. 10 bar (max. 145 psi)
Connection Pressurized flange DN25/PN16, ASME 1" lbs 150, JIS 10K25A
Certificates, declarations and approvals Material certification 3.1.B EN 10204

pH

Measuring Principle Potentiometric
Application Drinking water treatment plants, boiler feedwater and ultra-pure water plants, cooling-water circuits, fertiliser production, sugar production, gas scrubbers, petrochemical plants
Installation Flow assembly
Characteristic Piping, bypass
Design 3 electrode installation locations, 120mm electrodes, flow direction horizontal or from the bottom, thread connection G1/2" for spray cleaning
Material Flow vessel: PVDF or stainless steel 1.4404
O-rings: EPDM, Viton, Chemraz or Fluoraz
Process temperature PVDF version: 0 to 120 °C (32 to 248 °F)
Stainless steel version: -15 to 150 °C (5 to 302 °F)
With EPDM: -15 to 140 °C (5 to 284 °F)
Process pressure PVDF version: max. 8 bar at 50 °C (max. 116 psi at 122 °F)
Stainless steel version: max. 10 bar (max. 145 psi)
Connection Pressurized flange DN25/PN16, ASME 1" lbs 150, JIS 10K25A
Certificates, declarations and approvals Material certification 3.1.B EN 10204

The Flowfit CPA240 flow assembly is designed for use at high temperatures and pressures. With different connections, it provides three sensor mounting positions and flexibly adapts to your process application. Sensors are easy to install and remove, saving maintenance and recalibration time.

Benefits

  • Easy removal and installation of the electrode holder (e.g. for calibration)

  • Flexible connection to the process using different connection heads and mounting methods

  • Goretex filter reduces condensation

  • Accommodates three sensors or cleaning units of 120 mm length, reducing installation effort

Application areas

  • The Flowfit CPA240 is used for pipe installation in the following applications:

  • Chemical industry

  • Petrochemical industry

  • Power plants and waste incineration plants

  • Mining, metallurgy and metal processing

  • Drinking water treatment plants

  • Suitable for applications with pressures up to 10 bar (stainless steel) or 8 bar (PVDF)

Spare Parts & Accessories 54

54 spare parts · click to collapse
Order codeDescription
51501191CoverDetails
51501193Union nutDetails
51501194*** Union NutDetails
51501175bracketDetails
51501176bracketDetails
51501177*** bracketDetails
51501178*** bracketDetails
51501163bracketDetails
51501164bracketDetails
51501165bracketDetails
51501166bracketDetails
51501167bracketDetails
51501168bracketDetails
51501169bracketDetails
51501170bracketDetails
71161431bracketDetails
71161433bracketDetails
71161434bracketDetails
71161435bracketDetails
51501162Kit CPA140/240-3 PM connectionDetails

Configurator / Comparison

ConfigureEnter a product model to configure
CompareEnter the product models to compare — up to three products

Source: public information from the Endress+Hauser website

All documents for this model
7 documents · click to expand
BA

BA Flowfit CPA240 Chinese

Rev. 1420 28 pages
Preview
BA

Flowfit CPA240 English

Rev. 1420 28 pages
Preview
BA

Operating Instructions CPA 240 English

19 pages
Preview
TI

Flowfit CPA240 Chinese

Rev. 1421 12 pages
Preview
TI

技术资料 Flowfit P CPA240 Chinese

Rev. 0198 8 pages
Preview
TI

Flowfit CPA240 English

Rev. 1421 12 pages
Preview
TI

Technical Information CPA 240 English

8 pages
Preview
Municipal Wastewater Treatment

Municipal Wastewater Treatment · brackets — Application Case

Customer Profile

The typical setting in Municipal Wastewater Treatment is the inlet, biological and outlet stages of a municipal plant. The measuring point is brackets; the focus is mounting, fixation and position adjustment for instruments.

Key Difficulties

Conditions are high solids and corrosive fractions, with large diurnal flow swings and, on top of that, effluent parameters drift and probes foul with sludge and biofilm, which a standard configuration cannot handle for long. The design therefore starts with checking structural strength by material, corrosion class and load.

Implementation

The scope ran through the system components range: supplying as a full cabinet and signal-chain configuration. Technically it hinges on checking structural strength by material, corrosion class and load, and on these requirements: stable compliance with Grade 1A discharge limits and online data reporting.

Customer Benefit

In practice this means accurate mounting positions that remove measurement bias at the source, which cut the workload on the site maintenance team.

Food & Beverage

Food & Beverage · brackets — Application Case

Project Background

The project covers dosing, pasteurising, filling and CIP stages. The work centres on brackets and the core task is mounting, fixation and position adjustment for instruments.

Operating Challenges

The medium and duty are characterised by syrups, dairy and beverages that scale easily, under strict hygienic requirements, and frequent cleaning demands instruments that withstand hot CIP/SIP caustic cycles. So brackets cannot be specified generically — it calls for checking structural strength by material, corrosion class and load.

Solution

The Ainstru engineering team worked through the system components range: supplying as a full cabinet and signal-chain configuration. The configuration involves checking structural strength by material, corrosion class and load, with these requirements in view: food-safety and hygienic design per 3-A / EHEDG.

Results

Since start-up the system has run steadily; the practical result is accurate mounting positions that remove measurement bias at the source.

Chemical & Pharmaceutical

Chemical & Pharmaceutical · brackets — Application Case

Project Overview

The site is reactors, metering vessels and finished-product tanks. The customer wanted brackets properly configured on the existing plant, with the aim of mounting, fixation and position adjustment for instruments.

Technical Challenges

What actually causes trouble is highly corrosive media with solvents and crystallisation, partly in explosive atmospheres, and corrosion plus Ex protection shortens instrument life and makes downtime costly. All of this means the brackets configuration has to involve checking structural strength by material, corrosion class and load.

Configuration

Supply and installation were organised through the system components range: supplying as a full cabinet and signal-chain configuration. On site this meant checking structural strength by material, corrosion class and load, checked line by line against: Ex certification and GMP traceability of records.

Performance

After commissioning the outcome is accurate mounting positions that remove measurement bias at the source, and the readings are now used for process tuning.

Power & Energy

Power & Energy · brackets — Application Case

Site Conditions

This is a Power & Energy customer whose plant is at boiler feedwater, turbine condensate and FGD/DeNOx systems. The main task was mounting, fixation and position adjustment for instruments.

The Problem

The difficulty lies in high temperature and pressure with both steam and saline water; at the same time drift under high temperature and pressure, with very costly unplanned outages. Specification therefore means checking structural strength by material, corrosion class and load.

What We Did

We took a system components range approach — supplying as a full cabinet and signal-chain configuration. Delivery was built around checking structural strength by material, corrosion class and load, with point-by-point checks on: compliance with power-industry codes and unit availability targets.

Operating Outcome

In service the system performs as intended — accurate mounting positions that remove measurement bias at the source, with routine maintenance falling noticeably.