Instrumentation · Engineering · Package · PLC
0755-82221901 sales@ainstru.com

SWG70 WirelessHART Fieldgate

SWG70 WirelessHART Fieldgate

WirelessHART Fieldgate SWG70

Endress+Hauser's WirelessHART Fieldgate SWG70 has been designed to act as interface between a system using Ethernet or RS-485 physical layer and WirelessHART network. The gateway is designed for mounting in explosion hazardous areas Zone 2. An integral or remote antenna can be mounted according to the needs of the application.
Compare

Wireless components

Measuring Principle
Function Intelligent WirelessHART gateway with Ethernet and RS-485 interfaces
Certification Non-hazardous area, ATEX, IEC Ex
Input WirelessHART communication interface
Transmission rate: Nominal 250 kBits/s
Operating frequency: 2.4 GHz (ISM band)
Transmission range under reference conditions:
Outdoor 250 m, indoor 50 m
Output Ethernet (10 BASE-T/10 BASE TX)
- Configurable for HART IP and MODBUS TCP communication
RS-485 serial interface
- Configurable for HART Version 7.0 or MODBUS RTU communication
EtherNet/IP interface
Auxiliary power supply / Loop power supply 20 VDC to 30 VDC
Dimensions (wxhxd) W x H x D:
257 mm x 85 mm x 285 mm with cable glands and antenna
257 mm x 85 mm x 115 mm without cable glands and antenna
Software Internal software for controlling the WirelessHART network including web interface for configuration.
Operation Integral via Pushbuttons
PC configuration:
- Web browser via Ethernet
- FieldCare via Ethernet (HART IP CommDTM) or RS-485 (S-MUX DTM)
Display Integral via 5 LEDs
Operating Voltage 20 VDC to 30 VDC
Nominal current <5 W

The Endress+Hauser WirelessHART Fieldgate SWG70 is designed as an interface between systems using the Ethernet or RS-485 physical layer and the WirelessHART network. The gateway is designed for installation in Zone 2 hazardous areas, with an intrinsically safe antenna port. Internal or remote antennas can be installed according to application requirements.

Benefits

  • WirelessHART network with easy commissioning and self-organizing diagnostics

  • Seamless integration of field device information into higher-level systems via standardized protocols such as MODBUS, Ethernet, HART-IP or OPC

  • Wireless configuration and management of intelligent field devices using FieldCare

  • Flexible Fieldgate operation in hazardous areas of the plant

Application areas

Process optimization, tank and silo monitoring/inventory control, and equipment status monitoring. The WirelessHART gateway converts and stores wireless device data in a format compatible with other systems. With an Ethernet interface and serial port for connection to host applications such as plant asset management and SCADA tools.

Source: public information from the Endress+Hauser website

Spare Parts & Accessories 9

9 spare parts · click to collapse
Order codeDescription
71131502dipole antennaConsists of: Dipole antenna, mounting kit Usage: WirelessHART FieldgateDetails
71131503Flat Panel AntennaConsists of: Panel antenna, mounting kit Usage: WirelessHART FieldgateDetails
71131504Cabinet antennaConsists of: Cabinet antenna, mounting kit Usage: WirelessHART FieldgateDetails
71131505Lightning / EMP ProtectorConsists of: Lightning / EMP protector Usage: WirelessHART FieldgateDetails
71131509Coaxial cable 2.5 mConsists of: Coaxial cable 2,5 meter Usage: WirelessHART FieldgateDetails
71131508Coaxial cable, 5 mConsists of: Coaxial cable 5 meter Usage: WirelessHART FieldgateDetails
71131507Coaxial cable 10 mConsists of: Coaxial cable 10 meter Usage: WirelessHART FieldgateDetails
71131506Coaxial cable 15 mConsists of: Coaxial cable 15 meter Usage: WirelessHART FieldgateDetails
71131510Replacement antennaConsists of: Default dipole antenna Usage: WirelessHART FieldgateDetails

Configurator / Comparison

ConfigureEnter a product model to configure
CompareEnter the product models to compare — up to three products
All documents for this model
7 documents · click to expand
BA

操作手册 WirelessHART Fieldgate SWG70 Chinese

Rev. 1414 28 pages
Preview
BA

WirelessHART Fieldgate SWG70 Operating Instructions English

Rev. 1821 143 pages
Preview
BA

WirelessHART Fieldgate SWG70 Brief Operating Instructions DE, EN, FR, ES, IT, NL English

Rev. 1816 44 pages
Preview
TI

WirelessHART Fieldgate SWG70 Technical Information English

Rev. 1821 12 pages
Preview
TI

SWG70 English

Rev. 1313 8 pages
Preview
TI

WirelessHART Fieldgate SWG70 Technical Information English

8 pages
Preview
TI

WirelessHART Fieldgate SWG70 Technical Information English

12 pages
Preview
Municipal Wastewater Treatment

Municipal Wastewater Treatment · Gateways and modems — Application Case

Project Background

The project covers the inlet, biological and outlet stages of a municipal plant. The work centres on Gateways and modems and the core task is converting field data into remote transmission channels.

Operating Challenges

The medium and duty are characterised by high solids and corrosive fractions, with large diurnal flow swings, and effluent parameters drift and probes foul with sludge and biofilm. So Gateways and modems cannot be specified generically — it calls for configured by protocol, tag count and carrier network conditions.

Solution

The Ainstru engineering team worked through the system components range: supplying as a full cabinet and signal-chain configuration. The configuration involves configured by protocol, tag count and carrier network conditions, with these requirements in view: stable compliance with Grade 1A discharge limits and online data reporting.

Results

Since start-up the system has run steadily; the practical result is remote sites can report back, making unattended operation possible.

Food & Beverage

Food & Beverage · Gateways and modems — Application Case

Project Overview

The site is dosing, pasteurising, filling and CIP stages. The customer wanted Gateways and modems properly configured on the existing plant, with the aim of converting field data into remote transmission channels.

Technical Challenges

What actually causes trouble is syrups, dairy and beverages that scale easily, under strict hygienic requirements, and frequent cleaning demands instruments that withstand hot CIP/SIP caustic cycles. All of this means the Gateways and modems configuration has to involve configured by protocol, tag count and carrier network conditions.

Configuration

Supply and installation were organised through the system components range: supplying as a full cabinet and signal-chain configuration. On site this meant configured by protocol, tag count and carrier network conditions, checked line by line against: food-safety and hygienic design per 3-A / EHEDG.

Performance

After commissioning the outcome is remote sites can report back, making unattended operation possible, and the readings are now used for process tuning.

Chemical & Pharmaceutical

Chemical & Pharmaceutical · Gateways and modems — Application Case

Site Conditions

This is a Chemical & Pharmaceutical customer whose plant is at reactors, metering vessels and finished-product tanks. The main task was converting field data into remote transmission channels.

The Problem

The difficulty lies in highly corrosive media with solvents and crystallisation, partly in explosive atmospheres; at the same time corrosion plus Ex protection shortens instrument life and makes downtime costly. Specification therefore means configured by protocol, tag count and carrier network conditions.

What We Did

We took a system components range approach — supplying as a full cabinet and signal-chain configuration. Delivery was built around configured by protocol, tag count and carrier network conditions, with point-by-point checks on: Ex certification and GMP traceability of records.

Operating Outcome

In service the system performs as intended — remote sites can report back, making unattended operation possible, with routine maintenance falling noticeably.

Power & Energy

Power & Energy · Gateways and modems — Application Case

Application Context

boiler feedwater, turbine condensate and FGD/DeNOx systems is a typical Power & Energy duty. The project started from Gateways and modems, focusing on converting field data into remote transmission channels.

Process Constraints

drift under high temperature and pressure, with very costly unplanned outages, and high temperature and pressure with both steam and saline water only amplify it. The Gateways and modems specification must therefore cover configured by protocol, tag count and carrier network conditions.

Delivery Approach

Delivery was handled as the system components range — supplying as a full cabinet and signal-chain configuration. Execution centred on configured by protocol, tag count and carrier network conditions, together with compliance with power-industry codes and unit availability targets.

Field Results

Operation shows the benefit clearly — remote sites can report back, making unattended operation possible, with confidence in this measuring point improving markedly.