Instrumentation · Engineering · Package · PLC
0755-82221901 sales@ainstru.com

ARV-SG63 VEGASWING 63 lock nut

ARV-SG63 VEGASWING 63 lock nut

VEGASWING 63 lock nut

VEGA ARV-SG63
Configurable Models 20 models
Locking bolt for VEGASWING 63

Application range

- For continuous height adjustment of VEGASWING 63 up to a process pressure of 64 bar

24 models · click to expand
Model Name
SWING63.XXGBVXMR SWING63.XXGBVXMR
ARV-SG63.2GC ARV-SG63.2GC
ARV-SG63.4GC ARV-SG63.4GC
SWING63.DMOIVXUR SWING63.DMOIVXUR
ARV-SG63.4NC ARV-SG63.4NC
SWING63.DAGBVXMR SWING63.DAGBVXMR
ARV-SG63.2ND ARV-SG63.2ND
ARV-SG63.3GH ARV-SG63.3GH
ARV-SG63.4ND ARV-SG63.4ND
SWING63.DAGAVXUR SWING63.DAGAVXUR
ARV-SG63.1GD ARV-SG63.1GD
SWING63.CAGAVXMZ SWING63.CAGAVXMZ
ARV-SG63.1NC ARV-SG63.1NC
ARV-SG63.3NC ARV-SG63.3NC
ARV-SG63.3ND ARV-SG63.3ND
ARV-SG63.4GD ARV-SG63.4GD
ARV-SG63.1GC ARV-SG63.1GC
ARV-SG63.3GC ARV-SG63.3GC
SWING63.XXFEVXPR SWING63.XXFEVXPR
SWING63.CAGAVXPZ SWING63.CAGAVXPZ
Municipal Wastewater Treatment

Municipal Wastewater Treatment · brackets — Application Case

Customer Profile

The typical setting in Municipal Wastewater Treatment is the inlet, biological and outlet stages of a municipal plant. The measuring point is brackets; the focus is mounting, fixation and position adjustment for instruments.

Key Difficulties

Conditions are high solids and corrosive fractions, with large diurnal flow swings and, on top of that, effluent parameters drift and probes foul with sludge and biofilm, which a standard configuration cannot handle for long. The design therefore starts with checking structural strength by material, corrosion class and load.

Implementation

The scope ran through the system components range: supplying as a full cabinet and signal-chain configuration. Technically it hinges on checking structural strength by material, corrosion class and load, and on these requirements: stable compliance with Grade 1A discharge limits and online data reporting.

Customer Benefit

In practice this means accurate mounting positions that remove measurement bias at the source, which cut the workload on the site maintenance team.

Food & Beverage

Food & Beverage · brackets — Application Case

Project Background

The project covers dosing, pasteurising, filling and CIP stages. The work centres on brackets and the core task is mounting, fixation and position adjustment for instruments.

Operating Challenges

The medium and duty are characterised by syrups, dairy and beverages that scale easily, under strict hygienic requirements, and frequent cleaning demands instruments that withstand hot CIP/SIP caustic cycles. So brackets cannot be specified generically — it calls for checking structural strength by material, corrosion class and load.

Solution

The Ainstru engineering team worked through the system components range: supplying as a full cabinet and signal-chain configuration. The configuration involves checking structural strength by material, corrosion class and load, with these requirements in view: food-safety and hygienic design per 3-A / EHEDG.

Results

Since start-up the system has run steadily; the practical result is accurate mounting positions that remove measurement bias at the source.

Chemical & Pharmaceutical

Chemical & Pharmaceutical · brackets — Application Case

Project Overview

The site is reactors, metering vessels and finished-product tanks. The customer wanted brackets properly configured on the existing plant, with the aim of mounting, fixation and position adjustment for instruments.

Technical Challenges

What actually causes trouble is highly corrosive media with solvents and crystallisation, partly in explosive atmospheres, and corrosion plus Ex protection shortens instrument life and makes downtime costly. All of this means the brackets configuration has to involve checking structural strength by material, corrosion class and load.

Configuration

Supply and installation were organised through the system components range: supplying as a full cabinet and signal-chain configuration. On site this meant checking structural strength by material, corrosion class and load, checked line by line against: Ex certification and GMP traceability of records.

Performance

After commissioning the outcome is accurate mounting positions that remove measurement bias at the source, and the readings are now used for process tuning.

Power & Energy

Power & Energy · brackets — Application Case

Site Conditions

This is a Power & Energy customer whose plant is at boiler feedwater, turbine condensate and FGD/DeNOx systems. The main task was mounting, fixation and position adjustment for instruments.

The Problem

The difficulty lies in high temperature and pressure with both steam and saline water; at the same time drift under high temperature and pressure, with very costly unplanned outages. Specification therefore means checking structural strength by material, corrosion class and load.

What We Did

We took a system components range approach — supplying as a full cabinet and signal-chain configuration. Delivery was built around checking structural strength by material, corrosion class and load, with point-by-point checks on: compliance with power-industry codes and unit availability targets.

Operating Outcome

In service the system performs as intended — accurate mounting positions that remove measurement bias at the source, with routine maintenance falling noticeably.