Instrumentation · Engineering · Package · PLC
0755-82221901 sales@ainstru.com

CPA473 Cleanfit P

CPA473 Cleanfit P
Cleanfit P CPA473
The Cleanfit CPA473 retractable assembly is designed for application in fibrous or sticky media. Its patented sleeve seals and integrated scrapers make sure that nothing sticks to the sensor. Cleanfit offers highest operating comfort: You can replace sensors and even service the assembly while the process is running. The optional electric or pneumatic control system enables automated cleaning and calibration even in difficult processes.
Compare

ORP / Redox

Measuring Principle Sensor ORP / Redox
Application Chemical industry, paper industry, wastewater, industrial water, power plants, refuse incinerators, sugar industry
Installation Retractable holder with ball valve
Characteristic Open and closed tank, piping (min DN80)
Design Manual or pneumatical
Manual or pneumatical ball valve
Can be fully automated with CPC30 / 300
Integrated rinse chamber with connection G 1/4" or NPT 1/4"
Material Seals: EPDM / FPM / perfluoroelastomer
Electrode holder: stainless steel 1.4404
Ball valve: Stainless steel 1.4401, PTFE
Inlet safety seal: PVDF, PTFE, Viton®
Outlet safety seal: PVDF, Stainless steel 1.4404
Rinse connection socket: Stainless steel 1.4404
Dimension Immersion depth: 61 to 235mm
(2.4 inch to 9.25 inch)
Process temperature PA pressure cylinder (manually only):
Max. 80 °C (176 °F)
Stainless steel pressure cylinder:
up to 100°C (212 °F) with continuous operation up to 6 bar (87 psi)
Process pressure PA pressure cylinder: Max. 6 bar (87 psi)
Stainless steel pressure cylinder: Max. 10 bar (145 psi)
Pneumatic outlet safety seal:
6 bar at 100 °C (87 psi at 212 °F)
Connection G1¼ internal thread, DN50, DN65, ANSI 2"
Certificates, declarations and approvals 3.1.B EN 10204

pH

Measuring Principle Potentiometric
Application Chemical industry, paper industry, wastewater, industrial water, power plants, refuse incinerators, sugar industry
Installation Retractable assembly with ball valve
Characteristic Open and closed tank, piping (min DN80)
Design Manual or pneumatical
Manual or pneumatical ball valve
Can be fully automated with CPC30 / 300
Integrated rinse chamber with connection G 1/4" or NPT 1/4"
Material Seals: EPDM / FPM / perfluoroelastomer
Electrode holder: stainless steel 1.4404
Ball valve: Stainless steel 1.4401, PTFE
Inlet safety seal: PVDF, PTFE, Viton®
Outlet safety seal: PVDF, Stainless steel 1.4404
Rinse connection socket: Stainless steel 1.4404
Dimension Immersion depth: 61 to 235mm
(2.4 inch to 9.25 inch)
Process temperature PA pressure cylinder (manually only):
Max. 80 °C (176 °F)
Stainless steel pressure cylinder: up to 100°C (212 °F) with continuous operation up to 6 bar (87 psi)
Process pressure PA pressure cylinder: Max. 6 bar (87 psi)
Stainless steel pressure cylinder: Max. 10 bar (145 psi)
Pneumatic outlet safety seal:
6 bar at 100 °C (87 psi at 212 °F)
Connection G1¼ internal thread, DN50, DN65, ANSI 2"
Certificates, declarations and approvals 3.1. acc. to EN 10204

Product Overview

The Cleanfit CPA473 retractable assembly is designed for applications with fibrous media. The patented sleeve seal and built-in wiper ensure that the sensor remains free of buildup. The Cleanfit offers maximum operating convenience: sensors can be replaced, and the assembly even serviced, while the process is running. Optional electric or pneumatic control systems ensure automatic cleaning and calibration even under demanding process conditions.

  • Benefits

  • Safe and reliable isolation from the process under virtually all operating conditions

  • In-service maintenance of the assembly: the entire assembly body can be removed through a sealed ball valve (e.g. for replacing sealing rings, electrode holder supports, etc.)

  • Fully automatic operation even under different process conditions

  • Easy installation: all hoses of the assembly with pneumatic ball valve are pre-connected

  • Application areas

  • Chemical industry

  • Paper industry

  • Wastewater/industrial water

  • Power plants

  • Waste incineration plants

Spare Parts & Accessories 58

58 spare parts · click to collapse
Order codeDescription
51512677heat-shrinkable tubeDetails
51512678Electrode guideDetails
51503774CPA471/472 PA Cylinder BodyKIT CPA471/472 cylinder PA longDetails
71042130CPA471/472 PA Cylinder BodyDetails
71329949CPA47X Spare Parts: Check ValveDetails
51503776CPA471 stainless steel bodyKIT CPA471 cylinder SS longDetails
71042134CPA471/472 Cylinder BodyDetails
51512689CPA473 cleaning chamberDetails
71082107CPA47: Mating flangeDetails
71329946CPA473/474 spare parts: rinse nozzle G1/8-G1/4Details
71329947KIT CPA473/474: Rinse nozzle G1/8-NPT1/4Details
51511929Pneumatic Outlet Valve PortOutlet valve pneumatic CPA473 G1/4"Details
51511934Pneumatic Outlet Valve PortOutlet valve pneumatic CPA473 NPT1/4"Details
71240620CPA47x drain valve: Viton O-ringDetails
51511937Pneumatic Outlet Valve PortOutlet valve manual CPA473/474 G1/4"Details
51511938Pneumatic Outlet Valve PortOutlet valve manual CPA473/474 NPT1/4"Details
51511939check valveCheck valve CPA473/474 G1/4"Details
51511940check valveCheck valve CPA473/474 NPT1/4"Details
51512698ball valveDetails
51512707CPA473 Wind-drivenDetails

Configurator / Comparison

ConfigureEnter a product model to configure
CompareEnter the product models to compare — up to three products

Source: public information from the Endress+Hauser website

All documents for this model
6 documents · click to expand
BA

Operating Instructions Cleanfit P CPA473 English

Rev. 1109 52 pages
Preview
TI

技术资料 Cleanfit P CPA473 Chinese

Rev. 1109 20 pages
Preview
TI

Technical Information Topcal S CPC310 English

Rev. 1315 32 pages
Preview
TI

Technical Information Retractable assembly Cleanfit P CPA473 English

Rev. 1109 20 pages
Preview
TI

Technical Information Topcal S CPC310 English

32 pages
Preview
TI

Technical Information Retractable assembly CleanFit P CPA 473 English

12 pages
Preview
Municipal Wastewater Treatment

Municipal Wastewater Treatment · brackets — Application Case

Customer Profile

The typical setting in Municipal Wastewater Treatment is the inlet, biological and outlet stages of a municipal plant. The measuring point is brackets; the focus is mounting, fixation and position adjustment for instruments.

Key Difficulties

Conditions are high solids and corrosive fractions, with large diurnal flow swings and, on top of that, effluent parameters drift and probes foul with sludge and biofilm, which a standard configuration cannot handle for long. The design therefore starts with checking structural strength by material, corrosion class and load.

Implementation

The scope ran through the system components range: supplying as a full cabinet and signal-chain configuration. Technically it hinges on checking structural strength by material, corrosion class and load, and on these requirements: stable compliance with Grade 1A discharge limits and online data reporting.

Customer Benefit

In practice this means accurate mounting positions that remove measurement bias at the source, which cut the workload on the site maintenance team.

Food & Beverage

Food & Beverage · brackets — Application Case

Project Background

The project covers dosing, pasteurising, filling and CIP stages. The work centres on brackets and the core task is mounting, fixation and position adjustment for instruments.

Operating Challenges

The medium and duty are characterised by syrups, dairy and beverages that scale easily, under strict hygienic requirements, and frequent cleaning demands instruments that withstand hot CIP/SIP caustic cycles. So brackets cannot be specified generically — it calls for checking structural strength by material, corrosion class and load.

Solution

The Ainstru engineering team worked through the system components range: supplying as a full cabinet and signal-chain configuration. The configuration involves checking structural strength by material, corrosion class and load, with these requirements in view: food-safety and hygienic design per 3-A / EHEDG.

Results

Since start-up the system has run steadily; the practical result is accurate mounting positions that remove measurement bias at the source.

Chemical & Pharmaceutical

Chemical & Pharmaceutical · brackets — Application Case

Project Overview

The site is reactors, metering vessels and finished-product tanks. The customer wanted brackets properly configured on the existing plant, with the aim of mounting, fixation and position adjustment for instruments.

Technical Challenges

What actually causes trouble is highly corrosive media with solvents and crystallisation, partly in explosive atmospheres, and corrosion plus Ex protection shortens instrument life and makes downtime costly. All of this means the brackets configuration has to involve checking structural strength by material, corrosion class and load.

Configuration

Supply and installation were organised through the system components range: supplying as a full cabinet and signal-chain configuration. On site this meant checking structural strength by material, corrosion class and load, checked line by line against: Ex certification and GMP traceability of records.

Performance

After commissioning the outcome is accurate mounting positions that remove measurement bias at the source, and the readings are now used for process tuning.

Power & Energy

Power & Energy · brackets — Application Case

Site Conditions

This is a Power & Energy customer whose plant is at boiler feedwater, turbine condensate and FGD/DeNOx systems. The main task was mounting, fixation and position adjustment for instruments.

The Problem

The difficulty lies in high temperature and pressure with both steam and saline water; at the same time drift under high temperature and pressure, with very costly unplanned outages. Specification therefore means checking structural strength by material, corrosion class and load.

What We Did

We took a system components range approach — supplying as a full cabinet and signal-chain configuration. Delivery was built around checking structural strength by material, corrosion class and load, with point-by-point checks on: compliance with power-industry codes and unit availability targets.

Operating Outcome

In service the system performs as intended — accurate mounting positions that remove measurement bias at the source, with routine maintenance falling noticeably.