Modular installation bracket, suitable for measuring drinking water and process water
Compare

Disinfection

Measuring Principle Ozone
Application Drinking water
Utilities of all industries
Less drained sample water
Characteristic Flow assembly for multiparameter measurement
Design Flow through assembly with optimized flow path for disinfection sensors and for 12 mm sensors
optional: flow monitoring
optional: dosing
Material Plexiglas (PMMA) with FKM seals
Dimension modular, from WxHxD 165x155x73 mm (6.50x6.10x2.87 in) up to 345x249.5x94 mm (13.58x9.82x3.70 in)
Process temperature 0 to 60 °C (32 to 140°F)
Process pressure 0 to 4 bar (0 to 58 psi) relative
Connection G1/4" or adaptation

The Flowfit CYA27 can measure up to 6 relevant parameters simultaneously. The sensors are installed in the assembly for high-precision measurement, with a sample flow rate as low as 5 l/h (1.32 gph). It enables precise control of processes such as disinfection with minimal water loss. The assembly offers highly flexible mounting options, with optional integrated sampling valve, cleaning unit, and dosing unit. Flow monitoring ensures uninterrupted measurement.

Advantages

  • Maximum flexibility: The modular design of the assembly meets the requirements of various applications. Up to 6 parameters can be measured simultaneously. Multiple mounting options help users correctly position the sensors to ensure high-precision measurement results.
  • Minimum water loss: With the sensors installed in the Flowfit CYA27, the required sample flow rate is as low as 5 l/h (1.32 gph). Only a small amount of water is consumed.
  • Reliable measurement: Integrated flow monitoring ensures uninterrupted measurement. Optional status indicator provides clear visibility of whether the flow is correct, helping users quickly identify and correct errors.
  • Easy maintenance: Optional cleaning unit and dosing unit automatically adjust cleaning cycles and acidification media to meet the requirements of specific disinfection processes.

Application

The Flowfit CYA27 flow-through assembly supports multi-parameter measurement, such as free chlorine, chlorine dioxide, free bromine, ozone, pH/ORP, conductivity, or dissolved oxygen, and is primarily installed in bypass lines for measurement. It is suitable for the following applications:

  • Drinking water
  • Process water
  • Seawater
  • Swimming pool water

Spare Parts & Accessories 41

41 spare parts · click to collapse
Order codeDescription
XPC0014-Spare and upgrade modules CYA27Spare- and upgrade modules for flow assembly CYA27.Enquire
71486835Kit CYA27 Flow switch, Non-ExDetails
71486836Kit CYA27 Flow switch Cl. I Div. 2Details
71486843Kit CYA27 Status indication lightDetails
71585617Kit CYA27 cable, 2 m, Non-ExDetails
71486872Kit CYA27 cable, 10 m, Non-Exfor flow switch or status indication lightDetails
71486877Kit CYA27 cable, 10 m, ExDetails
71486839Kit CYA27 Sampling valve PVCDetails
71486841Kit CYA27 Sampling valve PVDFDetails
71486844Kit CYA27 Potential matching connectionDetails
71486849Kit CYA27, 2x adapter G1/4-G1/8, PVCG1/8 inner thread, with O-Ring FKMDetails
71486850Kit CYA27 2x adapter G1/4-G1/2, PVCG1/2 inner thread, with O-Ring FKMDetails
71486852Kit CYA27 2x adapter G1/4-NPT1/4, PVCNPT1/4 inner thread, with O-Ring FKMDetails
71486855Kit CYA27 2x adapter G1/4-NPT1/2, PVCNPT1/2 inner thread, with O-Ring FKMDetails
71486857Kit CYA27, 2x Adapter G1/4-G1/8, PVDFG1/8 inner thread, with O-Ring FKMDetails
71486858Kit CYA27 2x Adapter G1/4-G1/2, PVDFG1/2 inner thread, with O-Ring FKMDetails
71486860Kit CYA27 2x Adapter G1/4-NPT1/4, PVDFNPT1/4 inner thread, with O-Ring FKMDetails
71486863Kit CYA27 2x Adapter G1/4-NPT1/2, PVDFNPT1/2 inner thread, with O-Ring FKMDetails
71486865Kit CYA27 2x Adapter G1/4-6mm OD, PVDFHose connection 6 mm OD/ 4 mm ID, with O-Ring FKMDetails
71486867Kit CYA27 2x Adapter G1/4-8mm OD, PVDFHose connection 8 mm OD/ 6 mm ID, with O-Ring FKMDetails

Configurator / Comparison

ConfigureEnter a product model to configure
CompareEnter the product models to compare — up to three products

Measuring principle video

Click to play
All documents for this model
4 documents · click to expand
BA

BA Flowfit CYA27 Chinese

Rev. 0423 64 pages
Preview
BA

BA Flowfit CYA27 English

Rev. 0423 68 pages
Preview
TI

TI Flowfit CYA27 Chinese

Rev. 0323 12 pages
Preview
TI

TI Flowfit CYA27 English

Rev. 0323 12 pages
Preview
Municipal Wastewater Treatment

Municipal Wastewater Treatment · sterilize — Application Case

Customer Profile

The typical setting in Municipal Wastewater Treatment is the inlet, biological and outlet stages of a municipal plant. The measuring point is sterilize; the focus is monitoring and controlling disinfectant dosing and efficacy.

Key Difficulties

Conditions are high solids and corrosive fractions, with large diurnal flow swings and, on top of that, effluent parameters drift and probes foul with sludge and biofilm, which a standard configuration cannot handle for long. The design therefore starts with matching monitoring points to the disinfection route (chlorine, UV, ozone).

Implementation

The scope ran through the analyser range: selecting as part of a complete water-analysis system. Technically it hinges on matching monitoring points to the disinfection route (chlorine, UV, ozone), and on these requirements: stable compliance with Grade 1A discharge limits and online data reporting.

Customer Benefit

In practice this means on-demand dosing, lowering both by-products and cost, which cut the workload on the site maintenance team.

Food & Beverage

Food & Beverage · sterilize — Application Case

Project Background

The project covers dosing, pasteurising, filling and CIP stages. The work centres on sterilize and the core task is monitoring and controlling disinfectant dosing and efficacy.

Operating Challenges

The medium and duty are characterised by syrups, dairy and beverages that scale easily, under strict hygienic requirements, and frequent cleaning demands instruments that withstand hot CIP/SIP caustic cycles. So sterilize cannot be specified generically — it calls for matching monitoring points to the disinfection route (chlorine, UV, ozone).

Solution

The Ainstru engineering team worked through the analyser range: selecting as part of a complete water-analysis system. The configuration involves matching monitoring points to the disinfection route (chlorine, UV, ozone), with these requirements in view: food-safety and hygienic design per 3-A / EHEDG.

Results

Since start-up the system has run steadily; the practical result is on-demand dosing, lowering both by-products and cost.

Chemical & Pharmaceutical

Chemical & Pharmaceutical · sterilize — Application Case

Project Overview

The site is reactors, metering vessels and finished-product tanks. The customer wanted sterilize properly configured on the existing plant, with the aim of monitoring and controlling disinfectant dosing and efficacy.

Technical Challenges

What actually causes trouble is highly corrosive media with solvents and crystallisation, partly in explosive atmospheres, and corrosion plus Ex protection shortens instrument life and makes downtime costly. All of this means the sterilize configuration has to involve matching monitoring points to the disinfection route (chlorine, UV, ozone).

Configuration

Supply and installation were organised through the analyser range: selecting as part of a complete water-analysis system. On site this meant matching monitoring points to the disinfection route (chlorine, UV, ozone), checked line by line against: Ex certification and GMP traceability of records.

Performance

After commissioning the outcome is on-demand dosing, lowering both by-products and cost, and the readings are now used for process tuning.

Power & Energy

Power & Energy · sterilize — Application Case

Site Conditions

This is a Power & Energy customer whose plant is at boiler feedwater, turbine condensate and FGD/DeNOx systems. The main task was monitoring and controlling disinfectant dosing and efficacy.

The Problem

The difficulty lies in high temperature and pressure with both steam and saline water; at the same time drift under high temperature and pressure, with very costly unplanned outages. Specification therefore means matching monitoring points to the disinfection route (chlorine, UV, ozone).

What We Did

We took a analyser range approach — selecting as part of a complete water-analysis system. Delivery was built around matching monitoring points to the disinfection route (chlorine, UV, ozone), with point-by-point checks on: compliance with power-industry codes and unit availability targets.

Operating Outcome